1. PLANNED OUTAGE

We are proud to be your electricity supplier in Papua New Guinea. We are responsible for the reliable and efficient supply of electricity to all our valued customers. However, our aim is to minimise the impact of any outage that may affect you. Except in emergencies, if an upgrade or maintenance to the network requires us to interrupt supply, we will notify you at least five days before the planned outage.

The date and the estimated start and finish times of the planned outage will be advertised on the newspapers, radio advertisement, email, phone, fax, or flyer.

In the event of an emergency planned outage, we may not be in a position to notify you or update our planned outages information in time.


If you are without power and your street does not appear on the planned outage updates page, check our unplanned outages webpage or contact PNG Power on 323 4774 if you live in the National Capital District or Central Province. For other centres, Click Here for phone numbers to call if there is no power supply to your area.

Outages
Date Time Prov Areas Affected

WED JUNE 04

9:00 am - 4:00 pm. GAZELLE Kaivuna, Hamamas Only, Harbours Board.

FRIDAY JUNE 06

9:00 am - 4:00 pm.

GAZELLE  

Volcanic Observatory.

SATURDAY JUNE 07

7:00 am - 3:00 pm

 NCD Marine Base, Yatch Club, Dock area, IRC, Bank of PNG, us Embassy, Paga Hill, Hanuabada & POM Tech

SATURDAY JUNE 07

8:00 am - 5:00 pm. 

NCD Parts of 8 & 9 Mile, Malolo Estate, ATS and Moitaka area.

SATURDAY JUNE 07  

8:00 am - 5:00 pm. 

NCD Big Rooster, Waigani, Wespac, Waigani Stop N Shop, BSP Islander, National Newspaper, Pacific Engineering, Century 21, MVIL and Theodist.

SUNDAY JUNE 08

8:00 am - 5:00 pm. 

NCD Big Rooster, Waigani, Wespac, Waigani Stop N Shop, BSP Islander, National Newspaper, Pacific Engineering, Century 21, MVIL and Theodist. 

SUNDAY JUNE 08 

8:00 am - 5:00 pm. 

NCD Badili, Kaugere, Sabama, 2 Mile Hill, Parts of Korobosea and SVS.

SUNDAY JUNE 08 

8:00 am - 1:00 pm. 

LAE 2 Mile, Bugandi, 3 Mile to Yalu and Muya Village, Wau Bulolo Junction to Gabensis Villages. 

2. MADANG PLANNED LOAD SHEDDING SCHEDULE

LOAD SHEDDING SCHEDULE WILL BE FOR INDEFINITE PERIOD

<< Click Here to View MADANG Load Shedding Shedual >>

THIS SCHEDULE IS PROVIDED AS A GUIDE ONLY AND MAY BE ALTERED WITHOUT ANY NOTICE SHOULD THERE BE A GENERATION SHORTFALL BEYOND OUR CONTROL. CONSUMERS WITH PRIVATE GENSET ARE ENCOURAGED TO RUN THEIR SETS AT THE TIME SCHEDULED TO AVOID INCONVENIENCES. PNG POWER WISHES TO APOLOGIZE TO OUR VALUED CONSUMERS FOR ANY NCONVENIENCES CAUSED.

2. VANIMO  PLANNED LOAD SHEDDING SCHEDULE

EFFECTIVE DATE: WEDNESDAY 14/05/14 (CONTINUE FOR INDEFINITE PERIOD)

<< Click Here to View Vanimo Load Shedding Shedual >>

THIS SCHEDULE IS PROVIDED AS A GUIDE ONLY AND MAY BE ALTERED WITHOUT ANY NOTICE SHOULD THERE BE A GENERATION SHORTFALL BEYOND OUR CONTROL. CONSUMERS WITH PRIVATE GENSET ARE ENCOURAGED TO RUN THEIR SETS AT THE TIME SCHEDULED TO AVOID INCONVENIENCES. PNG POWER WISHES TO APOLOGIZE TO OUR VALUED CONSUMERS FOR ANY NCONVENIENCES CAUSED.